Goodman Work Log

Goodman Work Log

2010-10-05: S. Heathcote & S. Pizarro removed 1200l/mm grating and installed 2100l/mm grating.  The installed gratings are 300l/mm, 600l/mm, and 2100l/mm.

2010-10-07: S. Pizarro & D. Maturana removed the 300l/mm grating and installed the 1200l/mm grating.  The installed gratings are 1200l/mm, 600l/mm, and, 2100l/mm.

2010-10-09: D. Maturana removed the 1200l/mm grating and installed the 300l/mm grating.  The installed gratings are 300l/mm, 600l/mm, and 2100l/mm.

2010-10-10: S. Points changed the software limit on camera focus from 1000 to 3000.

2010-10-13: P. Ugarte removed the 300l/mm grating and installed the 1200l/mm grating.  The installed gratings are 1200l/mm, 600l/mm, and 2100l/mm. 

2010-10-13: S. Points changed the software limit on the camera focus from 3000 to 1000.

2010-10-15: P. Ugarte removed the 1200l/mm grating and installed the 300l/mm grating.  The installed gratings are 300l/mm, 600l/mm, and 2100l/mm.

2010-10-15: S. Points changed the software limit on the camera focus from 1000 to 3000.

2010-10-15: E. Parkes reports that the bottom of the shutter plate was out of place.  G. Gomez removed and replaced the shutter assembly.

2010-10-29: P. Ugarte removed the 300l/mm grating and installed the 2100l/mm grating.  The installed gratings are 2100l/mm, 600l/mm, and 1200l/mm.

2010-10-31: P. Ugarte removed the 2100l/mm grating and installed the 300l/mm grating.  The installed gratings are 300l/mm, 600l/mm, and 1200l/mm.  Image slicer removed.

2010-11-16: D. Maturana removed the 2100l/mm grating and installed the 300l/mm grating.  The installed gratings are 300l/mm, 600l/mm, and 1200l/mm.

2010-11-27: P. Ugarte installed 300l/mm grating. The installed gratings are 300l/mm, 600l/mm, and 1200l/mm.

2010-12-14: S. Pizarro removed 300l/mm grating and installed the 2100l/mm grating.

2011-01-20: P. Ugarte removed 300l/mm grating and installed the 2100l/mm grating.

2011-01-20: S. Points changed max camfocus from +3000 to +1000.

2011-02-27: Gratings 300l/mm, 1200l/mm, and 2100l/mm installed by D. Maturana.

2011-09-01: L. Fraga removed 1.03" slit for repairs.

2011-09-05: 1.03" slit re-installed for testing.